|
| 
|

|
| 1. The pool layout is carefully marked for precision. |
2. The dig begins the process for perfection. |
| 
|

|
| 3. The hole is carefully prepared to achieve proper shape and depth. |
4. Now that the parameters are correct, the pool is ready to be set in place. |
| 
|

|
| 5. The timely process of filling the pool with water begins. |
6. The proper plumbing and electrical equipment is installed. |